Gafcon News

Armory Lives On

11/09/18 – Building Design & Construction Magazine: Armory Lives On. It took a community effort to get this museum built.
By David Barista

The story of the Wende Museum is one of grit and determination on the part of the project team, city leaders, and the community. An adaptive reuse of an abandoned national guard armory, the project involved years of fundraising, donations, and pro bono services to make this non-profit museum a reality. Numerous product manufacturers donated materials and systems (roofing, waterproofing, lighting, HVAC), and all major subcontractors gifted time or materials for the cause.

The team worked closely with the city and local organizations to create a community-centric educational facility. The city granted a 75-year lease for $1 in exchange for a free, fully accessible museum with community-focused programs, exhibits, and events. Meetings with school district officials led to hands-on history and training programs for students, including internship opportunities for high schoolers. The museum houses a 100,000-piece collection of art, archives, and memorabilia—one of the largest Cold War collections in the U.S.

The armory was constructed to survive a first strike of an atomic bomb dropped on Los Angeles. It includes two aboveground bunkers with walls nine inches thick. The building still has the original air filtration system embedded into the walls.

Renovation work included the installation of a space-saving, two-pipe HVAC system; construction of a storage area with custom, 10-foot-tall, 100-foot-long windows that let visitors see into the collection; and the reuse of existing materials, such as the colonnade eve system and nuclear bomb vaults.

PROJECT SUMMARY: BUILDING TEAM: Gafcon (submitting firm, CM), Paravent Architects (architect), Montenegro Consultants (SE), Building Solutions Group (MEP, CE), Antonio Acoustics (acoustical engineer), John Levy Lighting Productions (lighting design), Segal Shuart Landscape Architects. DETAILS: 12,596 sf TOTAL Cost: $6.5 million CONSTRUCTION TIME: November 2016 to November 2018 DELIVERY METHOD: Design-bid-build

>>Read Article in PDF

Recent Gafcon News

Construction Business Owner: Leaders on the Changes

02/06/20 – Construction Business Owner: What Aspect of Your Business Has Evolved Most Over the Last Decade? 3 industry leaders on the changes they’ve seen their companies undergo Marty Glaske Senior Vice President of Business Development, Gafcon, Inc. Historically, construction has been an inefficient industry. Today’s owners want more sophistication and predictability in safety, cost, …read more

ENRCalifornia - California & Northwest People
Construction Professionals: February Updates 2020

02/03/20 – ENRCalifornia: Updates About Construction Professionals for February 2020 Gafcon, Inc. has promoted Marty Glaske to senior vice president of business development. In his new role, Glaske will direct business development strategies for Gafcon’s broader portfolio, including project management, technology, labor relations, expert witness, outreach and preconstruction. He previously led the firm’s labor relations …read more

San Pedro Public Market Construction

Gafcon, Inc. is collaborating with Jerico Development and The Ratkovich Company by providing pre-construction and project management services for the $150M public market in San Pedro located on 42-acres of waterfront property. This project, which started as a shared vision between the Port of Los Angeles and the local San Pedro community, was memorialized in the 2009 San Pedro …read more

Why Red?

Our Gafcon logo icon consists of six colors and tribal codes.

Red stands for “We deliver complex projects that power vibrant communities.”